1.5 Kw North Wales Hydroelectric System Installation Part 1

1.5 Kw North Wales Hydroelectric System Installation Part 11.5 Kw North Wales Hydroelectric System Installation Part 1

Video Informations

Title :1.5 Kw North Wales Hydroelectric System Installation Part 1
Duration : 27 minutes, 19 seconds
Uploader : Kris Harbour Natural Building
Added On: : 07 May, 2022
Views : 1.7M times
Likes : 0
Source : YouTube

Sharing



Descriptions

For the last week me and Raf have been working on a customer hydro electric installation. the system will average around 1kw with 1.5kw peak output at full flow. We managed to get all the ground work down in one week. The next job on the list is a timber