changes to the cross slide nut and adding oilers to the right hand side of the saddle 00:00 intro 00:40 strip lathe 04:30 remove apron 06:30 modification to top slide nut 08:56 remove top slide screw 0950 fit oilers to the saddle 14:30 rebuild
No download links available.