Cabin Loft & Railing
In this video Sarah and I arrive at the cabin for a 3 day stay. I turn on a thermostat in the crawlspace that drives a relay that turns on a fan if the temperature drops below a certain point. The fan pulls warm air into the crawl space. After that we start cutting and hanging drywall. Once the large pieces of 5/8 drywall are hung we can start working on the loft railing. I pre built the posts and the hand rails in the shop. Install one side of the railing and then start installing the cables for the railing system. It turns out to be pretty slow work. My Social Media: Patreon: https://www.patreon.com/user?u=27419329 Instagram: https://www.instagram.com/acabinand50acres/ @ 0:00 Goals for the trip @ 0:46 Crawl space freeze prevention @ 1:49 Cutting drywall @ 2:40 Hanging drywall @ 5:11 Second piece @ 6:19 Building the loft railing and posts @ 10:21 waiting for snow @ 12:15 Installing the posts @ 14:01 Handrails @ 15:06 Cable loft railing annoyance @ 20:018 Bye, fire dog, warm feet
Download
0 formatsNo download links available.