Hello All,
Over the past few days I've made progress on both the upper and lower cabinets. The big job was installing the composting toilet cabinet. It required a hole through the bottom of the van up into the cabinet so I could run a hose to the outside for venting purposes. This went surprisingly well and everything is working.
I also installed the two upper cabinets which required me to re-scribe the lines to match up with the siding I installed. That was intentional and also went quite well. Eventually I will get to building the doors (and drawers) for the cabinets but I wanted to install the cabinets first as there may be some twisting or flexing of the cabinets when I secure them into place. That way I can build the doors to fit which should work out well.
As of now everything seems to be going fairly well, so I'm sure I will run into a problem soon! 😁