When a steel plate fell from the primary crusher onto a conveyor at Cemex’s Dove Holes Quarry, Flexco Elevate® Belt Rip Prevention detected the damage and stopped the belt within 12 meters, preventing what could have been weeks of unplanned downtime and losses exceeding £700,000.
In this case study, hear directly from Cemex's team about how belt rip detection technology transformed their approach to conveyor maintenance, shifting from reactive repairs to proactive monitoring.
Learn more about Flexco Elevate®: https://info.flexco.com/elevate-belt-rip-prevention
Explore Flexco solutions: https://www.flexco.com
Featured Product: Flexco Elevate® Belt Rip Prevention
Customer: CEMEX
Location: Dove Holes Quarry, United Kingdom
Industry: Aggregates / Mining
Application: Belt Rip Detection
V0321_deUS_0311_CEMEXFlexcoElevateCaseStudy_0426
Download
0 formats
No download links available.
Cemex | Flexco Elevate® Belt Rip Prevention A Flexco Case Study (German) | NatokHD