The Ceona Amazon has a unique configured G-lay pipelay system (under patent application) which combines components of well-known tried and tested pipelay systems.
The welding line is traditional S-lay, however once welded, the pipe is deflected around a stern wheel and installed through a conventional pipelay tower with two tensioners and top tension
of 570t (mt) in 3,000m (10,000ft) water depth. On-vessel pipeline fabrication includes welding, NDT and FJC.
For more information, please visit: http://www.ceona-offshore.com/Fleet/Ceona-Amazon.aspx
Download
0 formats
No download links available.
Ceona Amazon Rigid Pipe Installation Procedure 3D | NatokHD