Construction joint beam column joint
Learn the correct method to provide construction joints at the beam–column junction in RCC structures. In this video, we explain where to place the joint, why location matters, and how to prepare the surface for a strong bond — based on IS 456 & IS 13920 guidelines. ✅ What you’ll learn: Introduction What are Construction Joints? Why beam–column junctions are critical Wrong joint location Correct joint location (50–100 mm away from column face) Surface preparation and bonding Reinforcement continuity Summary and site tips 📌 Related topics: - RCC detailing at beam–column junction - Ductile detailing for seismic design - Concrete bonding methods 🔍 Keywords: construction joints, beam column junction, RCC detailing, civil engineering, structural engineering, IS 456, IS 13920 #ConstructionJoints #CivilEngineering #RCCDetailing #BeamColumnJunction #StructuralEngineering #ConcreteWork 🎯 For more civil engineering tips, subscribe now and hit the bell icon 🔔