Back to Browse

F1D Build Project: Wing 2: Framing

180 views
Premiered Feb 17, 2026
28:38

This video is part of a series on building a complete F1D Plane. See the entire series on the playlist F1D Build Project, https://www.youtube.com/playlist?list=PLe1IYdMr0FSzOGTYBnClUX2WVj-3YszDL In this video, we frame the wing. This video includes the setup of the build board and addition of the spars, tips, and ribs. It follows the first wing video where parts were selected adn prepared. Content: 0:00 Remove ribs from build surface 0:42 Build Board preparation 2:40 Spars 7:11 Ribs 19:13 Tips 27:16 Closeout, instructions to remove from board This project has a companion document and other data on the F1D Blog, https://thef1dblog.wordpress.com/2015/06/14/f1d-plan-construction-information/ The build notes on this site will have links directly to pertinent steps in this series of videos. Plane designs: Salt Junior: https://thef1dblog.wordpress.com/wp-content/uploads/2015/06/2015-salt-jr-21.pdf F1D 4+: https://indoornewsandviews.com/2019/05/08/kang-lees-ama-cat-ii-record-f1d/ Kang Lees 2024 WC F1D: https://indoornewsandviews.com/2024/06/03/kang-lees-2024-world-champion-f1d/ 3-D Printed templates and forms: https://www.thingiverse.com/ceandra/designs

Download

0 formats

No download links available.

F1D Build Project: Wing 2: Framing | NatokHD