Foundation should be capable to support the vertical load of mast, bending moment due to static and dynamic load of OHE. Foundation design mainly depends on Soil and conditions prevailing at the location. There are certain masts at which OHE contact wire is terminated thus requiring anchor mast to balance the anchoring load.