STEVTENSIONER® Enabling installations The proof loading of a permanent mooring system for CALM buoys and FPSOs is critical for a system’s certification. The proof loads are typically 80-100% of the design load so that substantial bollard pull capacity is required. The use of the STEVTENSIONER® for subsea tensioning offers significant cost benefits as it reduces the required load by typically 60%. As a result mooring installations can be performed from modest anchor handlers or crane barges. More information: https://vryhof.com/products/installation-equipment/stevtensioner/ video by: DOCK90 I maritime & offshore communication partner https://dock90.com