Back to Browse

HPDC Vacuum System Setup (SOP + Pump & Tank Sizing) | Practical Training

Mar 14, 2026
1:17:24

Join this channel to get access to perks: https://www.youtube.com/channel/UCDif4LgqsoUVlOa2BDOW15Q/join In this practical HPDC Pathshala webinar, you will learn how to set up and run a die-cavity vacuum system in High Pressure Die Casting (HPDC)—from the basic vacuum concept to real shopfloor implementation. ✅ What you’ll learn in this training: Why vacuum is used in HPDC and how it reduces gas porosity & leak failures Complete vacuum system layout: pump, tank (reservoir), filters, traps, vacuum lines, and die-side interface Vacuum valve vs shut-off valve (clear difference and role in preventing metal suction) Step-by-step SOP for operators & engineers (start-up, production, shutdown) Key parameter settings: vacuum setpoint, vacuum OK, alarms, timing (open/close) Practical commissioning: hold test, leak check, and timing tuning How to decide vacuum tank size and vacuum pump capacity with formulas + examples Common vacuum-related problems on the shopfloor and proven troubleshooting actions How management can prevent “bypass culture” and build a stable vacuum process This session is ideal for HPDC process engineers, production teams, quality, die designers, and maintenance who want consistent casting quality and a repeatable process window. 🔔 For more HPDC practical training, follow HPDC Pathshala and explore Membership (structured learning + advanced sessions). Join Membership: https://www.youtube.com/@hpdcpathshalasds/membership Website: https://www.hpdcpathshala.com Keep Learning Till Death

Download

0 formats

No download links available.

HPDC Vacuum System Setup (SOP + Pump & Tank Sizing) | Practical Training | NatokHD