Bridge construction by incremental launching with ENKOFORM HMK.
Each stretch of the bridge deck is manufactured in a fixed pre-fabrication area behind the abutment. Each new stretch is joined to the previously built and pushed by a hydraulic system, so that the bridge deck is sliding on the piers previously built.