Gets interesting at 00:48
Hard ground slow drilling. just a small manway heading, all our other equipment was way to big to do this small drift.
Drilled this heading off before they had time to order a smaller jumbo or longtom. this video is obviolsy pure showboating, I wouldnt normally do this....however 2 drills drilling is ALWAYS faster then 1....unless u dont have the air pressure I guess.
Also to show that you don't need to be a beast of a man to run a jackleg/airleg. Some guys twice my size can barely run 1. Its all balance and coordination.