Rescue Drill at IDRIS Project SH4-4
Site Set-up SH 5-2
Tunnel Entry SH5-2 to SH5-3
AVN2000 Last Drive Break through SH 5-2 to SH 5-3
AVN2000 Break through SH 4-4 to SH 4-3
AVN2000 Break through SH 4-3 to SH 4-2
AVN2000 longest line Breakthrough SH4-20 to AS13 623m.
AVN800/1 Breakthrough SH6-2-1 to SH6-2
AVN800/3 Breakthrough SH7-34-2 to SH7-34-3
AVN1000 Breakthrough SH6-3 to SH6-2
AVN1600 Breakthrough SH5-9 to SH5-10
HSE Lead Meeting
BEACON Site Inspection SH 7-52
Qatar National Sports Day Activity
Featured in Herrenknecht Magazine 2018 Edition