Back to Browse

MRP Module - Settings Part 2

3.0K views
Apr 24, 2020
5:21

Production settings need to be configured before you can start utilizing DEAR's MRP module. These provide the guardrails for all the work you will be doing within the system. That includes settings for: – Factory calendar – Logistics paths – Work center – Resources – Bill of Materials (BOM) All these systems interconnect seamlessly to set a solid foundation for your manufacturing process.

Download

0 formats

No download links available.

MRP Module - Settings Part 2 | NatokHD