This is pile load test in pull as per IS 2911 (part 4) 2013, performed my me as site engineer Mr. Bilal Khan contact me for any querry 8279524588. Or mail me at [email protected].
Two criteria considered here as per is code 1 is 2/3 of load at which settlement cross 18mm or 2% of pile dia and 2 is 50% of load at which the settlement curve break at the point.