Welcome to Barnabas Junction.
Part 2 of 2 - In this 2nd Part I show the point motor installation, wiring them up and then connecting to the control panel for operation.
This is a very delicate procedure, drilling up through the baseboard and not cause any damage to the already fitted & ballasted point.
The point motors being fitted are Gaugemaster PM-2.
N.B. This setup is my way on how to simply operate insulfrog points.
Again would like to extend my many thanks to Jamie at Pennyhill Junction (http://bit.ly/2k7o2ep) for the help with the superb control panel track plan and also Garry at Cheekytek (http://bit.ly/2BCU76k) for the excellent technical advice with the wiring of the switches and point motors.
I hope you enjoy watching.
Please Like, Share, Comment & Subscribe.
Download
0 formats
No download links available.
Point Motor & Control Panel Switch Installation Part 2 | NatokHD