In this video I assemble a dual deploy redundant electronics bay.
*** Update, please read!! ***
Do not let the silver soldered end near the pyrogen come in contact with the copper charge well. This could short out the e-match and it may not ignite! Leave the small red cover on the match or use PVC, 3d printed charge wells or centrifuge tubes..
Topics covered in this video include.
Scratch built copper charge wells.
Wiring and connectors.
Testing procedures for connectors.
Reasons for redundant deployment.
Please show your support and buy me a coffee, thanks!
https://buymeacoffee.com/TheRocketeer
Avionics sled at Printables: https://www.printables.com/social/46625-jeremy/about
Supplies I used in this video. I earn a small commision from items purchased through Amazon links.
2x Venom Fly 2s, 7.4v batteries - https://amzn.to/3SAmNSL
Battery charger, Tenergy 80w charger - https://amzn.to/3bmBp7v
Crimp tool: https://amzn.to/3hMGuFr
Silicone wire: https://amzn.to/34lscIR
Wire connectors: https://amzn.to/3IRAveq
Brass nuts: https://amzn.to/3pLstw6
October Sky movie, a must watch for the rocketeer!!
Prometheus build: https://youtu.be/yxjNNg5xMbY
Please subscribe and like!