Back to Browse

roofing lead work valley

51.2K views
Jul 7, 2019
8:18

lead valley being re-placed with code 5 lead ,old valleys been stripped out de-nailed any nail heads sticking up have been hit down,brushed down, there should have been a breathable felt membrane used to go on top of the old sarking to let the lead expand over the sarking freely customer didnt want the extra cost (the custromer is a plumber to trade)15/19mm tilting fillet used for upstand for lead , lead cut to size,and dressed in the best that this mainly plasterer can do

Download

1 formats

Video Formats

360pmp432.0 MB

Right-click 'Download' and select 'Save Link As' if the file opens in a new tab.

roofing lead work valley | NatokHD