Back to Browse

RS7 | Control Point Acquisition

627 views
Apr 3, 2026
1:14

From Control Point Setup to Point Cloud Output | RS7 Workflow 📍 Control Point Acquisition Made Practical Working with control points is a key step in achieving reliable coordinate transformation — especially in complex environments. With SmartGo, the process stays clear and efficient, helping you move through fieldwork with fewer interruptions. 🔍 Field Considerations That Matter In real-world projects, consistency comes from attention to detail: ▪ Keep movements smooth when changing posture (e.g., squatting or standing) ▪ Avoid any obstruction in front of the device during collection ▪ Use at least 4 control points for coordinate transformation ▪ Distribute control points evenly across the survey area ▪ Avoid placing them in a straight line 📦 From Capture to Output Once scanning is complete: 🔸 Tap the orange button to stop data collection 🔸 A real-time LAS point cloud file will be generated automatically 🔸 Data is stored in the SLAM DATA folder of the project After saving, the device can be powered off. From field setup to final output, each step is designed to support a smoother and more reliable workflow. How do you usually arrange control points in your projects? 👇

Download

0 formats

No download links available.

RS7 | Control Point Acquisition | NatokHD