Shear Ram Testing Report Part 1
PURPOSE To provide assurance that proposed rental Cameron U Type 13 5/8” triple 10kpsi BOP (double/single, Shaffer 13 5/8” 5kpsi SBOP (annular) AND 13 5/8” 10 KPSI Drilling Spool are OEM certified, fully serviceable and fit for purpose Part 1 Initial Inspection: Conducted inspection of BOP(s) and testing arrangement: Inspection of certified test equipment: Inspection of Double, Single BOP and Drilling Spool against provided Data Package: Physical Inspection 4 1/16” 10kpsi SO flanges (x6) Ram Blocks and Packers were inspected against the COC’s and OEM Part Numbers: #BOP #BlowoutPreventer #CameronBOP #ShafferBOP #DrillingSpool #WellControl #BOPInspection #BOPTesting #PressureControl #OilAndGas #DrillingOperations #RigInspection #OEMCertified #OilfieldEquipment #APIStandards #DrillingRig #RigSafety #OilfieldSafety #HSE #PetroleumEngineering #WellIntegrity #PressureTesting #RamBOP #AnnularBOP #DrillingEquipment #InspectionAndTesting #OilfieldTraining #UpstreamOilGas #MechanicalIntegrity #DrillingHSE
Download
0 formatsNo download links available.