Back to Browse

Slough Data Centre

261 views
Feb 1, 2024
2:15

In a first for modular technology, Crown House Technologies manufactured and installed a 15.5 tonne UPS and a 1.4 tonne computer room air handler into the major data centre at Slough.

Download

0 formats

No download links available.

Slough Data Centre | NatokHD