PT Tohoma Mandiri membagikan pengalaman Jacking / Tunnel System pada Project IPAL Pengolahan Pipa Air Limbah di Palembang tepatnya di Jembatan Ampera di pinggir sungai Musi. Jacking yang dilakukan dengan kedalaman 10 meter dengan diameter pipa 1000mm. Kami tetap menggunakan lubricant dari Tunnel Gel (Bentonite) Ez-Mud sebagai annural space.
-----------------------------
PT Tohoma Mandiri shared the Jacking / Tunnel System experience at the WWTP Project for Wastewater Pipe Processing in Palembang, specifically at the Ampera Bridge on the edge of the Musi river. Jacking is done with a depth of 10 meters with a pipe diameter of 1000mm. We still use the lubricant from Tunnel Gel (Bentonite) Ez-Mud as an annural space.