TBC Site Quantity Takeoff - Create Storm Run

206 views
Nov 25, 2024
12:50

The process begins by setting up a storm sewer network using components from the MSI manager. The network, labeled as 'UTL-storm', is created on a cyan-colored layer under the 'site utilities' category. A utility run, named 'storm run', is then initiated, starting at a main storm manhole with a zero station. The run's material is specified as onsite earth. Subsequently, various utility nodes, such as storm manholes and junction boxes, are placed and named according to the plan, with specific elevations for rims and inverts noted. Each node is added to the 'utility-storm-structure' layer. The setup progresses by sequentially connecting these nodes with pipes, specifying details like type, size, and node connections. The pipes are used to form a comprehensive storm sewer network, facilitating the management of stormwater. The process is detailed and methodical, ensuring each component is accurately placed and documented to form an effective utility system.

Download

0 formats

No download links available.

TBC Site Quantity Takeoff - Create Storm Run | NatokHD