In December 2014, New Breeze Homes installed floor cassettes onto the first floor of a 2 unit townhouse development in Carnarvon Court, Queensland. The total first floor area covered 137.6m2 and was complete and ready for wall frames in just 3.5 hours. The floor cassettes used combined all the elements of the floor system including longreach floor trusses, strong backs and floor sheeting, into large but manageable panels. The floor cassettes for this project were manufactured by Bretts Timber and Trusses with the fully engineered design created using the latest release of Pryda’s structural engineering software - Pryda Build Version 4.