Back to Browse

Waste Neutralization Program WIP

52 views
Oct 4, 2024
0:33

Holt Construction is partnering with the client as general contractor to complete the upgrades to the waste management system. The scope of work includes the installation of a new waste neutralization system which treats all the hazardous chemicals which includes new double walled stainless steel pipe. The project required excavation and horizontal drilling underground to not disturb daily activities within the building itself.

Download

0 formats

No download links available.

Waste Neutralization Program WIP | NatokHD