So the work in the Workshop is a little slow.
I have been on a needed vacation, and my primary work is pretty busy at the moment.
Anyways, i decided to get rid of the old gate, and door. and replace it with another double door, and some outdoor lights.
There is still a way to go.
I need to do the Roof, heating system, floor, and then do some organising. but it is not going as fast as the house.
Macifif - Hope: https://youtu.be/qEg0vJbZnHk
⚛️ Macifif
https://soundcloud.com/macifif
https://www.facebook.com/macifif
https://twitter.com/Macifif