In Mérida, Mexico, CFE completed its 12th ACCC® Conductor project, using Hawk size conductor on a 115 kV line to double the capacity of two 4.9 km circuits without replacing existing steel monopoles. Spans ranging from 126 to 320 meters were installed with support from CTC Global’s Master Installers and the ACCC InfoCore® System, marking its first use in Latin America. This milestone project boosts grid capacity, reliability, and long-term performance.