In this video, Dan walks us through common maintenance procedures required to keep the ECB25A Combo Bundler running at peak performance. These procedures include many areas of the machine, including the infeed conveyor belt, pusher head, film unwind, air condensation canister, and more.
For more information about the ECB25A, visit us online, view our other videos, or give us a call!
www.eastey.com
[email protected]
1-800-835-9344