Induction Loop Installation | Williams AV
Installing Induction Loops in Williams AV River Room 00:15 Carpet Removed and Site Survey Completed 00:24 Room Dimensions 00:31 Perimeter Loop Design 00:47 Phased Array Master and Slave Loop Designs 01:07 Laying Carpet Tape 01:32 Laying Master Loop Cooper Foil 02:13 Splicing Copper Foil 02:35 Splicing Section Taped. Master Loop Complete 03:19 Laying Slave Loop 03:35 Master and Slave Loop Completed 04:50 Laying Protective Tape over Copper Foil 05:15 Lead Wires Soldered to Copper Foil 06:15 Master and Slave Loop Completed & Lead Wires Connected in Junction Box 06:35 Carpet Installed in River Room Williams AV, helping the world to hear, see, and engage. Learn more at www.WilliamsAV.com Resources: Advanced Loop Classes: https://williamsav.com/loop-advanced-classes/ Tech Blue Support: https://williamsav.com/support/tech-blue/ Hearing Loop Design Request: https://williamsav.com/hearing-loop-design-request/ Williams AV 10300 Valley View Road Eden Prairie, MN 55344 USA Ph: 800.328.6190 Intl: +1 952.943.2252 [email protected] [email protected] Follow us on social! Twitter: https://twitter.com/williamsav_llc LinkedIn: https://www.linkedin.com/company/williams-av/ www.WilliamsAV.com
Download
0 formatsNo download links available.