Nabors recently tested the efficiency of our Integrated Casing Running Tool at our Breen facility. Our TRS team demonstrates how quickly and safely connections can be made, with each connection taking less than 2 minutes.
This video captures key moments of the process, including:
✅ Hydraulic Elevator Lifting & Unlatching Pipe
✅ Autostab Connection with CDS Tool
✅ Flush Mount Slips (FMS) in Action
✅ Driller’s HMI Screen Interaction
Our innovative technology reduces the number of personnel required in the red zone—enhancing both efficiency and safety. Watch as we revolutionize casing operations with precision, speed, and automation.